• Home
  • Competitive Advantage
  • Services Offered
    • Construction Supervision
    • Design
    • Geotechnical Engineering
    • Construction Surveying
    • Logistics
  • Current Projects
    • Tokeh-Lumley Project
    • Wilkinson Road Widening Project (5.2Km)
    • Wilkinson Road Widening Project: Additional Works (Bottom Mango - Congo Cross)
    • 25 km Freetown Streets
    • Kailahun Township Road Project
    • Kenema-Pendembu Rehabilitation Project
    • Makeni (Panlap) - Kamakwei - Madina Oula Road Project
    • Pendembu-Kailahun Road Reconstruction Project
  • Big Picture
  • About Us
  • Contact Us
    • Report a Site Problem
  • Training Classes
    • EDA U.
  • EDA AGAINST EBOLA
    • In Action
Picture
"When we talk of infrastructure,
road components are perhaps one of the most important because when we talk of roads, we are not merely talking of connectivity,
​we talk of it in terms of a domestic economic stimulus."

Kamal Nath, Union Road Transport and Highways Minister, India (2009)

OUR SERVICES (WHAT WE DO)

  • Highway Construction Supervision 
  • Road Design for Highway Reconstruction, Rehabilitation 
  • Feasibility Studies and Economic Analyses for Highway Projects
  • Site Supervision for Civil Infrastructure Projects
  • Tender Document and Bid Package Preparation
  • Geotechnical Investigations 
  • Construction and Aerial Surveying
  • Logistical Support
Picture

​Our Vision (Why We Do What We Do)

  • besides earning a living, to contribute to making Sierra Leone a place of pride for every Sierra Leonean;
  • to strive for safe, sound, and efficient roads in Sierra Leone; and
  • to challenge ourselves, and each other, to be better than we imagined we could be.

Our Mission (How We Do What We Do)

  • by striving to retain the best professional and technical expertise available, as well as by staying on the cutting-edge of technological advances, to the best of our ability;
  • by not only providing jobs and worker training, but by also making growth opportunities available to any worker interested in challenging him/herself;
  • by creating a positive and safe working environment, encouraging communication, and welcoming input from team member, all while striving to do a better job each day, than was done the day before. 

Picture

OUR SERVICES

Construction Supervision
Design
Surveying
Logistics

COMPANY

About Us
Contact Us
Our Blog

SUPPORT

Support Page
Opportunities
Picture
Copyright © 2015
  • Home
  • Competitive Advantage
  • Services Offered
    • Construction Supervision
    • Design
    • Geotechnical Engineering
    • Construction Surveying
    • Logistics
  • Current Projects
    • Tokeh-Lumley Project
    • Wilkinson Road Widening Project (5.2Km)
    • Wilkinson Road Widening Project: Additional Works (Bottom Mango - Congo Cross)
    • 25 km Freetown Streets
    • Kailahun Township Road Project
    • Kenema-Pendembu Rehabilitation Project
    • Makeni (Panlap) - Kamakwei - Madina Oula Road Project
    • Pendembu-Kailahun Road Reconstruction Project
  • Big Picture
  • About Us
  • Contact Us
    • Report a Site Problem
  • Training Classes
    • EDA U.
  • EDA AGAINST EBOLA
    • In Action